Contact Us Home

Office: +61 1300 223 666
Mobile: +61 467 771 653

BAE Engineers'

Project Examples

  • Canterbury Road Bridge Underpass, Durability design to determine the durability measures to achieve 100 year design life in all concrete elements and metal elements in aggressive marine tidal condition and acidic sulfate soil condition. Durability modelling technique was use in the design process.
  • 444 Queen Street Brisbane, Durability and structural connection details were assessed on façades of this high-rise building using rope access method. Durability modelling (chloride and carbonation), coring samples and drilling samples, break out to sound concrete were used in the process to determine the residual life and suitable renewing methodology.   
  • Crosby Water Tanks, Site inspection and advices on the various issues related to concrete repair method, coating pull-off testing, surface preparation methods, asbestos removal, joint treatments, quality control, materials selection, and durability assessment, defective epoxy render investigation, metal corrosion investigation, prestart inspection, core testing etc.
  • Gold Coast TAFE, Site inspection, NDT and intrusive testings, strength evaluation using rebound hammer and core testing, condition assessment via testing and mathematical modelling to determine the residual life, repair options and specification, product selection for cathodic protection system with design requirements, and cost estimation etc.
  • Westgate Tunnel Melbourne, Early age thermal modelling and cracking analysis on various concrete bridge elements (beams, footings, and crossheads) to determine suitable thermal control measures to avoid or control the risk of severe cracking and DEF.  
  • Esperance Wind Farm, Early age thermal and cracking analysis on wind farm shaft footing of 3.1m deep in middle and 0.6m at the edge to provide cracking risk and required control measures.
  • German Creek Mine, Investigate and assess the current condition of a workshop floor slab concrete to determine the cause and extent of deterioration and suitable remediation options.
  • Energex Pit Normanby, Investigation to determine the concrete strengths via rebound hammer and core testing, GPR scanning to determine reinforcement details, and measuring carbonation depth and chloride ingress.
  • Energex Tower Maleny, Investigation to determine the dimension of concrete foundation and possible presence of any defect using sonic echo impact response (SEIR) system.
  • Norfolk and Aloha Apartments, Inspection of buildings in marine coastal condition to determine the cause and extent of deterioration. 
  • HOTA Gold Coast, Investigation of concrete floor blotchy colour variation using various techniques including microscopy, FTIR and other relevant techniques. 
  • Southport Courthouse, Investigation to determine the cause of deterioration on wall of balcony and render and to recommend suitable remediation solutions.
  • Kingsford Smith Drive Upgrade Project, Commissioning testing system and monitoring tensile forces and extension of 12 proof rock anchors under cyclic and incremental loading using laser transducers and data-loggers, data analysis and providing testing systems for long term testing of 3 additional anchors. 
  • Port of Melbourne, Durability design via chloride modelling to determine the durability measures for reinforced concrete fender beam, pilecaps and wharf slab deck with various options of cementitious materials and corrosion inhibitors.  Early age thermal modelling and analysis analyses to control DEF and cracking on these elements.     
  • Mission Bridge Weipa, Condition assessment using various NDT (GPR and rebound hammer) and intrusive testing (coring and sample drilling) and mathematical modelling on chloride penetration and carbonation process to determine the remaining life of the concrete deck slab and beams.
  • Southbank Riverwalk, Condition assessment of all concrete elements to determine the probability of reinforcement corrosion and residual life of the assets using mathematical modelling based on chloride, carbonation and corrosion test data, to recommend repair and testing options, and provide structural assessment and design solutions.  
  • Raha Beach Project UAE, Structural design for spine buildings A01, A02, A03, C01, C03, C07 (value three million USD) and large podium and retaining wall system, roof steel structures.
  • 373 Crown Street Wollongong, Seismic and wind structural analysis design report on this twenty-storey RC Building (20,000m2); designed/detailed all concrete walls, columns, and transfer beams.
  • Grafton Viaduct Railway Bridge, The load rating assessment on eighteen 15-m span post-tension decks and 48.5m steel truss structures of the bridge built in 1995.
  • 12-24 Stanley Street Kogarah NSW, Provide seismic and wind structural analysis design report, and designed/detailed all concrete walls, columns, and transfer beams in fifteen-storey RC Building (10,000m2).
  • Woodville Road Bridge Binda NSW, Proposed and designed bridge crossing over Crookwell River in three weeks including drafting.
  • Energex Com Tower Maleny, Investigation to determine the details of concrete foundation using sonic echo impact response (SEIR) system and ground digging method.
  • Southbank Park, GPR scanning to determine the location and layout of reinforcements in concrete footing.
  • QR Thornside, GPR scanning to determine the location and layout of reinforcements in concrete footing.
  • QR, Logan Bridge, GPR scanning to determine the location and layout of reinforcements in concrete bridge beams.
  • 42 Maxwell St, New Farm, Review and assessment the information provided regarding extent of asbestos presented and provide engineering advice on the best approach of removing the asbestos containing elements. 
  • ABR Warehouse, Inspection and assessment on the possible causes of cracking on pavement slabs and recommendations for rectification.
  • Southbank Park, GPR scanning to determine the details of reinforcement to allow drilling into concrete without damaging the reinforcement.
  • Futon Hogan Bluerock Quarry, Assessing bond strength via pull off testing of overlay layer over concrete to determine whether the bond strength is sufficient to comply with the project requirement.  
  • JBS Shed, Site investigation to determine reinforcement details using GPR and determine strength using rebound hammer testing.
  • Platinum Tower Doha Qatar, Review the structural design of the 45 storeys twisting tornado-shaped tower with rigid center thick ring wall and rigid perimeter column-beam-bracing steel framing system including concrete reinforced walls, sloping columns, composite floors, and peripheral steel member bracing, considering various loading conditions.
  • BRI Office Building, Structural analysis fourteen-storey reinforced concrete shear wall-frame at 1 Rivett Road, North Ryde